Stellaris Planner

Betharian Power Plant

Resource building

Betharian Power Plant is a resource building in Stellaris 4.5.2. It costs 200 Minerals and takes 360 days to build. It adds Miners, Acolytes of the Hammer and Mining Drones jobs, depending on the empire. It needs Betharian Refining.

Cost
200Minerals
Upkeep
—
Build time
360 days
ID
building_betharian_power_plant

Jobs Betharian Power Plant adds

Jobs come from the building's job modifiers; 4.x counts jobs in hundreds (a district adds 100). Variants for other kinds of empires are listed with their condition.

Already on a VPN? Check that it works at whoseesmyip.com →

Cost, upkeep and output

Base values; variants that apply only to some empires (nomadic empires pay other resources, for example) open with their condition.

Cost
200Minerals
20Rare Crystals — Nomadic empire
  • Nomadic empire
200Biomass — Wilderness empire
  • Owner
    • Wilderness empire
Produces a month
+10Energy Credits

What Betharian Power Plant does

On the planet
  • +2Energy Credits Produced per 100 Miners
Only in some cases

How to unlock Betharian Power Plant

In the game

Betharian Power Plants consume Betharian Stone to produce vast amounts of Energy Credits.

ID

building_betharian_power_plant

Betharian Power Plant: questions

How much does Betharian Power Plant cost in Stellaris?

200 Minerals, 360 days to build, base values before modifiers.

What jobs does Betharian Power Plant give?

Depending on the empire: Miners, Acolytes of the Hammer and Mining Drones.

What is the ID of Betharian Power Plant?

building_betharian_power_plant (Stellaris 4.5.2).

From the game files · Stellaris Cygnus v4.5.2 (9776). Base values before modifiers.

Spotted a mistake on this page, or have an idea for the site?