Stellaris Planner

Ministry of Energy

Resource building
Overlord

Ministry of Energy is a resource building in Stellaris 4.5.2. It costs 400 Minerals and takes 480 days to build, with an upkeep of 2 Energy Credits, 1 Exotic Gases a month.

Cost
400Minerals
Upkeep
2Energy Credits1Exotic Gases
Build time
480 days
ID
holding_energy_requisitorium

Jobs Ministry of Energy adds

Jobs come from the building's job modifiers; 4.x counts jobs in hundreds (a district adds 100). Variants for other kinds of empires are listed with their condition.

Adds no jobs.

Already on a VPN? Check that it works at whoseesmyip.com →

Cost, upkeep and output

Base values; variants that apply only to some empires (nomadic empires pay other resources, for example) open with their condition.

Cost
400Minerals
40Rare Crystals — Nomadic empire
  • Nomadic empire
Upkeep a month
2Energy Credits1Exotic Gases

What Ministry of Energy does

On the planet
  • -25%Monthly Loyalty

How to unlock Ministry of Energy

No technology needed.

Shown when (potential)
  • DLC: overlord
Can be built when (allow)
  • … must have technology: Planetary Power Grid

In the game

A ministry overseeing taxation and the minting of energy credits, often coming into conflict with the domestic bureaucracy.

ID

holding_energy_requisitorium

Ministry of Energy: questions

How much does Ministry of Energy cost in Stellaris?

400 Minerals, 480 days to build; upkeep 2 Energy Credits, 1 Exotic Gases a month, base values before modifiers.

What is the ID of Ministry of Energy?

holding_energy_requisitorium (Stellaris 4.5.2).

From the game files · Stellaris Cygnus v4.5.2 (9776). Base values before modifiers.

Spotted a mistake on this page, or have an idea for the site?